The hardest part of an addition is not the new construction — it is the joint. Where new meets old, rooflines, floor heights, and finishes have to reconcile so the result reads as one house rather than a house with something stuck to it.

How We Work

Why clients choose us

Addition tying into the existing structure
01

The seam is the craft

Matching rooflines, floor elevations, siding, and trim so the addition disappears into the original house.

02

Structural reality checked early

Second stories and large openings depend on what the existing foundation and framing will carry. We verify before designing.

03

Setbacks and FAR resolved first

What you are allowed to add is a zoning question. We answer it before you get attached to a plan.

Scope

What you get

  • Feasibility & zoning check
  • Structural assessment
  • Addition design & permitting
  • Foundation & framing
  • Tie-in & weatherproofing
  • Interior finish & integration
Questions

Answered honestly

If your question is not here, ask us directly. We would rather have the awkward conversation early than the expensive one later.

Is an addition cheaper than moving? +

Frequently in San Diego, given transaction costs and current rates — but not always. We will give you the honest construction number so you can compare properly.

Can I add a second story to my house? +

Often, but it depends on the existing foundation, framing, and zoning height limits. A structural assessment answers it definitively.

How long does an addition take? +

Most run 6–12 months of construction depending on size and whether the roof has to be opened up, plus permitting time beforehand.

Next Step

Ready to talk Additions?

Tell us what you are considering. We will give you a straight assessment of scope, cost, and timeline — before anyone signs anything.